The measuring equipment
(1) three-coordinates measuring machine
(2) video- measuring machine
(3) projection apparatus
(4) other measuring tool in common use
The method for quality control
(1)Every working procedure must be self-check
and special inspection
(2)Allowed to be delivered the next procedure
after inspecting the parts at this procedure.
(3)The electrode should be qualified before processing
on the EDM machine tool
(4) Every part should be checked by the quality
control department before assembling
(5) Pivotal part inspected by three-coordinates
measuring machine
(6) The hardness for main components should be
checked after heat treatment
(7)Roughness for the polishing part and the electrode
should be inspected
Quality improvement for
staff
(1) The staff should be seized of consciousness
of zero-defection for client product
at any time
(2) Every month the staff should be trained (3)
The quality department is responsible for improving
the quality defection
Design should be once in
place
(1) Amalgamat Euramerican logos of design into
our’s
(2) the confirmation for the mould structure should
analyzed and judged by expert
The processing should be
once in place
(1) All employees being in position should be
trained
(2) Possessing a whole set of modern equipments,
such as CNC Milling, CNC Lathing,
Electrical Discharge Machining(EDM), Computer-aided
plastic machine to realize the whole
processing by machining and keep the quality of
mould. |